Three Part Specification for Green Glue
This specification is for Green Glue for use in a variety of applications.
Green Glue is manufactured by The Green Glue Company.
Revised November 13, 2006
SECTION 13 48 13
MANUFACTURED SOUND AND VIBRATION CONTROL COMPONENTS
PART 1 - GENERAL
1.1 - SUMMARY
Specifier Note: Delete all items not pertinent to job
- Section Includes: vibration absorption material.
1.2 - REFERENCES
Specifier Note: Delete all items not pertinent to job
- General: Standards listed by reference, and are identified by issuing authority,
authority abbreviation, designation number or title by issuing authority. - American Society for Testing and Materials (ASTM):
- ASTM E84 Standard Test Method for Surface Burning Characteristics of Building Materials.
- ASTM E90-02 Standard Test Method for Laboratory Measurement of
Airborne Sound Transmission Loss of Building Partitions.
1.3 - SYSTEM DESCRIPTION
Specifier Note: Delete all items not pertinent to job
- Design Requirements: Provide products and systems that have been
manufactured, fabricated and installed to meet the following criteria: - [Specify system design criteria].
- Performance Requirements:
- [Specify system design criteria].
1.4 - SUBMITTALS
Specifier Note: Delete all items not pertinent to job
- Product Data: Submit manufacturer's product data and installation instructions.
1.5 - QUALITY ASSURANCE
Specifier Note: Delete all items not pertinent to job
- Installer Qualifications: Utilize an installer with experience with similar projects.
- Materials Qualifications: Provide ASTM test reports from independent laboratories with NVLAP certification of standards compliance, documenting product performance specified for:
- Acoustical properties
- Physical properties
- Fire-related properties
- Receiving, Storage and Handling
- Verify the quantity and condition of materials received.
- Provide secure area for storage.
- Keep material from freezing, keep above 40 degrees F.
- Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's absolute limits.
PART 2 - PRODUCTS
2.1 - MANUFACTURERS
Specifier Note: Delete all items not pertinent to job
- Manufacturer: The Green Glue Company
- Substitutions shall not be considered
2.1 - MATERIALS
Specifier Note: Delete all items not pertinent to job
- Provide Green Glue Viscoelastic damping compound
- Substitutions shall not be considered.
- Physical Properties:
- Active Content: 68% +/-5%
- Working Time: 30 minutes at room temperature
- Viscosity: Light Paste 65,000 cpd
- Color: Green
- VOC: >2 g/l
- Flash Point: >200 degrees F
- Application Temperature: 40 to 90 degrees F
- Fire-related Properties:
- Product is able to be inserted into fire-rated assembly per the International Building Code.
PART 3 - EXECUTION
Specifier Note: Delete all items not pertinent to job
3.1 - EXAMINATION
- Verification of Site Conditions
- Do not begin installation until substrates have been properly prepared.
- Do not begin if room temperature is below freezing.
3.2 - PREPARATION
- Clean surfaces thoroughly before installation.
- Follow the manufacturer’s guidelines for preparation and installation.
3.3 - GENERAL MANUFACTURER’S INSTRUCTIONS
- Refer to and comply with manufacturer’s installation instructions.
- Green Glue allows for 30 minutes of work time, however, assemble the panels as soon as possible.
- Green Glue will reach optimal performance in 30 days after assembly.
- Cleanup with soap and water while glue is wet.
- Green Glue contains no hazardous materials. Dispose of empty containers as you would any building material.
3.4 - INSTRUCTIONS FOR USING GREEN GLUE WITH DRYWALL
- Construct standard wall framing.
- Install the first standard layer of drywall as normal.
- Remove any dust or debris from drywall surfaces to be glued.
- Apply prescribed quantity of Green Glue in a random pattern to the back of the second layer of drywall.
- Assemble the coated drywall layer to the first layer and screw into place as normal.
- Use standard drywall screws.
- Screw the second layer into the wall studs.
- Screw spacing according to local building code.
- Seal the assembly with caulk or sealant.
- Seal the intersection of the wall and floor.
- Seal any gaps between walls and ceiling.
- Seal the electrical boxes.
- Drywall can be finished immediately after wall assembly
3.5 - PROTECTION
- Protect installed products until completion of project.
- Repair or replace any mechanical damage or deficiencies before Substantial Completion.